Award-winning Design for the Renovation of Social Housing in Glasgow (UK, 2016)

Award-winning Design for the Renovation of Social Housing in Glasgow (UK, 2016) - 1
Collective Architecture, on behalf of Queens Cross Housing Association, has developed proposals for the refurbishment of 3 blocks of flats, originally built in the late 1960s. The proposals for Cedar Street and Cedar Court are pioneering on an international level and will bring the Cedar ‘Multis’ to the forefront of energy performance in the UK....

Read More

New Office Building, Almere (NL, 2018)

New Office Building, Almere (NL, 2018) - 1
To improve performance of the employees and make them go home with a smile Fresh-r’s were installed in an open plan office space. In workplaces with too many people CO2 levels can rise well above 1200 parts per million (ppm), which is the accepted level of CO2 in schools. Research has shown that at 2000...

Read More

New Build Office Vroomshoop (NL, 2015)

New Build Office Vroomshoop (NL, 2015) - 1
Architect Jon Kristinsson designed the “Het Punt” activity center in Vroomshoop, Netherlands. The largest energy consumer in a well-insulated building is still the transmission (Rc = 5 m2k / W) through floors, walls, windows, doors and roofs. Immediately thereafter followed by ventilation. By using balanced ventilation with heat recovery from Fresh-r, 80-85% of this energy...

Read More

Renovated Office Building Almere (NL 2018)

Renovated Office Building Almere (NL 2018) - 1
An old office building was turned into elderly apartments with the highest level of comfort for a high quality of living. Fresh-r was installed so no space was wasted on ducting and the service area’s were kept comfortable with pre-heated air. The physiotherapy room in these pictures keeps this room fresh and comfortable by just...

Read More

Barneveld Office Renovation (NL 2017)

Barneveld Office Renovation (NL 2017) - 1
Due to the fast growth, this company hire many employees in a short period of time, indoor air quality dropped and some employees got headaches due to poor air quality. Fresh-r installed several units in the offices and within 30 minutes after operational employees felt their headache disappear. For quick installation (3 hours / unit)...

Read More

Fresh-r Products

Fresh-r benefits

Partners