Date: 2012

A 300m2 Solar Enhanced Passive House, pre constructed using a revolutionary twin stud timber frame method with the HRV fittings ready fixed, reducing cold bridges, material costs and increasing performance. The house arrived on site pre-finished including the HRV fittings to substantially reduce construction time, waste and costs. Overall building costs were similar to conventional building technique.